GateConnections

Mattanur to Udaipur via Mumbai

1 connection on the timetable in the last 7 days, each with its time between the gates on up to 10 days, to Thu 5 Nov. Find yours by its times.

Mumbai’s board may post take-off times rather than gate times. If so, connections here had up to 30 min less than shown.

Between the gates, a bar a day, oldest to latestTimetable

  1. 40 min apart 6E 2012 arrives 15:50 6E 6027 leaves 16:30 Between the gates: 1 h 04 to 2 h 05, typically 1 h 23

Statistics from past flights, not live flight information. Always check times and your connection with your airline, and don’t base travel or booking decisions on these numbers.

More via Mumbai