GateConnections

Guwahati to Jodhpur via Mumbai

1 connection on the timetable in the last 7 days, each with its time between the gates on up to 10 days, to Wed 4 Nov. Find yours by its times.

Mumbai’s board may post take-off times rather than gate times. If so, connections here had up to 30 min less than shown.

Between the gates, a bar a day, oldest to latestTimetable

  1. 1 h 20 apart 6E 6342 arrives 11:45 6E 2146 leaves 13:05 Between the gates: 2 h 31 to 3 h 52, typically 3 h 09

Statistics from past flights, not live flight information. Always check times and your connection with your airline, and don’t base travel or booking decisions on these numbers.

More via Mumbai