GateConnections

QP 1130 then AI 2588 at Mumbai

Bengaluru → Mumbai → New Delhi

Timetable, Mumbai time

13:15QP 1130 from Bengaluru at the gate

09:45AI 2588 to New Delhi leaves the gate

20 h 30 apart on the timetable, overnight

AI 2588 leaves 20 h 30 after QP 1130 arrives on the timetable: more than half a day, so not a connection we count.