QP 1335 then SG 640 at Mumbai
Bengaluru → Mumbai → Siliguri
Timetable, Mumbai time
07:05QP 1335 from Bengaluru at the gate
08:10SG 640 to Siliguri leaves the gate
1 h 05 apart on the timetable
Mumbai’s board may post take-off times rather than gate times. If so, connections here had up to 30 min less than shown.
The last 10 days both flew
Between the gates: QP 1335 reaching its gate to SG 640 leaving its gate.
5 h 55shortest
8 h 39typical
9 h 25longest
0 of 5 days had 15 min or more less than the timetable. A flight cancelled on 2 days. No gate time on the board on 3 days.
QP 1335 typically reached its gate 17 min early, SG 640 left 6 h 24 late.
Times each day
| Day | QP 1335 at the gate | SG 640 left the gate | Between |
|---|---|---|---|
| Mon 9 Nov | SG 640 cancelled | ||
| Thu 5 Nov | SG 640 cancelled | ||
| Wed 4 Nov | No gate time on the board | ||
| Tue 3 Nov | No gate time on the board | ||
| Mon 2 Nov | No gate time on the board | ||
| Sun 1 Nov | 06:48 17 min early | 16:13 8 h 03 late | 9 h 25 |
| Sat 31 Oct | 06:51 14 min early | 15:30 7 h 20 late | 8 h 39 |
| Fri 30 Oct | 06:41 24 min early | 14:34 6 h 24 late | 7 h 53 |
| Thu 29 Oct | 06:41 24 min early | 16:05 2 h 45 late | 9 h 24 |
| Wed 28 Oct | 06:50 15 min early | 12:45 4 h 05 late | 5 h 55 |
Statistics from past flights, not live flight information. Always check times and your connection with your airline, and don’t base travel or booking decisions on these numbers.